CORRIDOR‑BY‑CORRIDOR GANTT CHARTS (TEXT‑BASED)

The full sequencing of pipelines, SMRs, rail, ports, Arctic hubs, and industrial clusters

1. WEST CORRIDOR — ENERGY + PACIFIC GATEWAY

PHASE 1 (Years 1–3): Approvals + Routing

  • Finalize routing for:
    • West twin oil pipeline
    • West twin gas pipeline
    • West twin‑track rail
    • SMR sites
    • Port expansions (Prince Rupert, Kitimat, Vancouver)
  • Indigenous co‑governance agreements signed
  • SNAC approvals complete

PHASE 2 (Years 3–7): Construction Surge

  • Begin construction on:
    • West twin oil pipeline
    • West twin gas pipeline
    • West twin‑track rail
    • Port expansions
    • First SMRs
  • Workforce mobilization
  • NPPA procurement cycles begin

PHASE 3 (Years 7–12): Integration

  • Pipelines reach 50–70% completion
  • Rail reaches 50% completion
  • Ports reach 50% completion
  • SMRs under construction
  • Hydrogen + petrochemical clusters begin construction

PHASE 4 (Years 12–18): Completion

  • Pipelines complete
  • Rail complete
  • Ports complete
  • SMRs online
  • Industrial clusters operational

PHASE 5 (Years 18–25): Optimization

  • Autonomous freight integration
  • Hydrogen export terminals
  • Pacific logistics optimization

2. CENTRAL CORRIDOR — MANUFACTURING + MOBILITY

PHASE 1 (Years 1–3): Approvals + Routing

  • HSR routing finalized (Windsor–Toronto–Ottawa–Montreal–Quebec City)
  • SMR siting finalized
  • Transmission interties planned
  • Industrial park zoning

PHASE 2 (Years 3–7): Construction Surge

  • Begin construction on:
  • HSR segment 1 (Windsor–Toronto)
  • HSR segment 2 (Toronto–Ottawa)
  • HSR segment 3 (Ottawa–Montreal–Quebec City)
  • First SMRs
  • Industrial parks
  • Housing megaprojects

PHASE 3 (Years 7–12): Integration

  • HSR 50% complete
  • SMRs under construction
  • Industrial parks 50% complete
  • Housing 40% complete

PHASE 4 (Years 12–18): Completion

  • HSR complete
  • SMRs online
  • Industrial parks operational
  • Housing megaprojects complete

PHASE 5 (Years 18–25): Optimization

  • Autonomous passenger rail
  • Manufacturing automation
  • Grid modernization

3. ATLANTIC CORRIDOR — SHIPBUILDING + OCEAN LOGISTICS

PHASE 1 (Years 1–3): Approvals + Routing

  • East‑West pipeline terminus approvals
  • Port expansions (Halifax, St. John’s)
  • Shipyard modernization plans
  • SMR siting

PHASE 2 (Years 3–7): Construction Surge

  • Begin construction on:
  • East‑West pipeline terminus
  • Port expansions
  • Shipyard modernization
  • First SMRs

PHASE 3 (Years 7–12): Integration

  • Ports 50% complete
  • Shipyards 50% complete
  • SMRs under construction
  • Fisheries + aquaculture modernization

PHASE 4 (Years 12–18): Completion

  • Ports complete
  • Shipyards complete
  • SMRs online
  • Energy export terminals operational

PHASE 5 (Years 18–25): Optimization

  • Continuous shipbuilding
  • North Atlantic logistics integration
  • Marine engineering clusters mature

4. ARCTIC CORRIDOR — SOVEREIGNTY + STRATEGIC FRONTIER

PHASE 1 (Years 1–3): Approvals + Siting

  • Siting of 6 primary Arctic hubs
  • Siting of redundant hub
  • SMR siting
  • Icebreaker production line established
  • ISR network planning

PHASE 2 (Years 3–7): Construction Surge

  • Begin construction on:
  • First 3 Arctic hubs
  • Icebreaker fleet
  • First SMRs
  • ISR network phase 1

PHASE 3 (Years 7–12): Integration

  • First 3 hubs complete
  • Next 3 hubs under construction
  • Icebreakers 50% complete
  • SMRs under construction
  • ISR network 50% complete

PHASE 4 (Years 12–18): Completion

  • All 6 hubs complete
  • Redundant hub complete
  • SMRs online
  • Icebreaker fleet complete
  • ISR network complete

PHASE 5 (Years 18–25): Optimization

  • Year‑round Arctic shipping
  • Arctic logistics clusters
  • Defence integration

5. NATIONAL CRITICAL PATH SUMMARY

Critical Path Items (must not slip):

  • Pipeline approvals (Years 1–2)
  • HSR approvals (Years 1–2)
  • Arctic hub siting (Years 1–2)
  • SMR siting (Years 1–2)
  • Build‑Immediately enforcement (Years 3–5)
  • Pipeline construction (Years 3–15)
  • HSR construction (Years 3–15)
  • Arctic hubs (Years 3–18)
  • SMRs (Years 3–20)

Parallel Tracks (can run simultaneously):

  • Industrial clusters
  • Housing megaprojects
  • Shipbuilding
  • Port expansions
  • Workforce alignment
  • Indigenous co‑governance